The City will provide fill sand at each location. This project will include, delivery, excavation, installation and clean-up. Each toilet will be self-contained with owl guard, solar lighting and exhaust fan. Project Scope: The purpose of this project is to install three (3) Pre-fabricated vault toilet structures located at three (3) separate locations. Approved by City Council on September 21, 2021.Ĭurrent Status: Units are in Fabrication. Project Estimated Completion Date: Complete Vault Restrooms for Upper & Lower Purgatory and Spring Lake Natural Areas The eastside riverfront parks area (Thompson's Island and Cape's area) are currently not included in this plan, but will have a focused study completed following the conclusion of other projects within those areas. A community survey and two open houses will formally gather input and help guide the future development and improvements to the riverfront parks system. This concept map is included within the 2019 San Marcos Parks, Recreation, and Open Space Master Plan and is included for reference only. The area highlighted in red below is the approximate boundary of the study area. Project Scope: The purpose of this project is to provide a more detailed and focused study on the Riverfront Parks area. Survey: The Survey closed on June 30, 2022. Public Open Houses: Saturday, May 14, 2022, 10AM-6PM at the San Marcos Activity Center and a second Open House will be held in the future. Project Estimated Completion Date: Summer 2023 ![]() Riverfront Parks Preliminary Design Report This plan will provide operational and policy guidance for land management. The study area will include the City’s existing natural area system properties including: Spring Lake Preserve, Lower Purgatory Creek, Prospect Park, Upper Purgatory Creek, Western Loop Unit (Early, Millican, Ringtail, Buie), Schulle and Sessom Canyons Unit, Blanco River Unit (Blanco Shoals and Blanco Riverwalk), and other City controlled contributing properties. ![]() Project Scope: T he purpose of this project is to prepare a land management plan for the City's 1000+ acre existing natural area system. Public Open House: May 14, 2022, 10AM-6PM at the San Marcos Activity Center, Room 1 Project Estimated Completion Date: Fall 2022
0 Comments
Leave a Reply. |